Site work and paving for a sidewalk / parking lot in Morgantown, West Virginia. Completed plans call for site work for a 100,500-square-foot sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Milling and Paving of existing designated areas. West Virginia University on behalf of its Board of Governors ("BOG") located in Morgantown, West Virginia ("WVU" or "University") is initiating this Request for Bids ("RFB") from qualified, experienced, and licensed Contractors for the labor and materials to mill and resurface designated areas of the Health Sciences Center Parking lot. Substantial Completion shall be December 1, 2021. Final Completion shall be December 15, 2021. Cutoff for Questions: Date: October 12, 2021 Time: 12:00 pm EST Questions MUST be submitted Electronically Addenda will be posted Electronically while the system should generate an automatic email, please be sure to visit the site regularly during this solicitation. Final Completion is considered when project site is de-mobilized and all project documents listed in Close-Out section of the specifications has been sent to the owner. LIQUIDATED DAMAGES - The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay in achieving Substantial Completion and Two Hundred and Fifty Dollars ($250) per Calendar Day of delay in achieving Final Completion. Question Submission Close Date 10/14/2021 11:00 AM EDT Parking lot sizes are approximate. Contractor shall field verify and determine how much labor and materials are necessary. Parking Lot Mountaineer Station is approximately 26,500 ft2 and is near the Health Sciences Center. Lot 90-1 is approximately 29,000 ft2. Lot 90-2 is approximately 7,000 ft2. Lot 84-1 is approximately 28,000 ft2. Lot 84-2 approximately 10,000 ft2 Parking Lots Mountaineer Station, Lot 90 and Lot 84 are already paved. They will need milled and repaved. All of the parking lots are in current use. Construction start dates must be coordinated with WVU in advance. At least 48 hours written notice must be provided to WVU before any lot is taken out of service. 4. Mountaineer Station Lot: a. Need milled and paved. b. Contractor shall remove and dispose of concrete bumper blocks. WVU will remove rubber bumper blocks. c. WVU will remove posts. d. Contractor is responsible for striping. e. Only the driving area needs milled and paved. Not the central parking portion of this lot. 5. Lot 90-1 and 90-2: a. Need milled and paved. b. Contractor shall remove and dispose of concrete bumper blocks. WVU will remove rubber bumper blocks. c. WVU will remove posts. d. Contractor is responsible for striping. e. Only the driving area needs milled and paved, not the parking area. 6. Lot 84-1 and 84-2: f. Need entire lot milled and paved. g. Contractor shall remove and dispose of concrete bumper blocks. h. WVU will remove posts. i. Contractor is responsible for striping. 7. All asphalt surfaces to be standard cold milled minimum 1.5". Milling residue shall not be permitted to flow into any gutters or drainage system. If any millings accrue in any drain system, the contractor is responsible for removal. Any excavated and milled materials shall become property of the contractor and must be disposed of off-site.

Award

Sidewalks / Parking Lot

$122,892.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
42
Bidding Soon
621
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2021

November 24, 2021

img_map_placeholder

1 Medical Center Dr, Morgantown, WV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.