BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2021 at 7:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Champlin, Minnesota. Completed plans call for site work for a water / sewer project.

The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following: - Remove existing dehumidifier and makeup air unit in building basement. - Remove existing ductwork from systems no longer used. - Remove and retain for owner the existing split-system air conditioner in electrical room. - Two (2) desiccant dehumidifiers. - Two (2) condensing units. - Chemical room exhaust fans, louvers, registers and ductwork. - Backwash sludge sump cover and exhaust fan. - New ductwork, louvers, grilles and registers for exhaust and air handler systems. - Modify existing janitor's closet plumbing fixtures to construct a chase for ductwork routing. - Provide and install two (2) split-system air conditioners in the electrical room. - Provide and install standalone controls for each new and modified air system. Additonal Description: The City Council reserves the right to reject any and all bids and to waive any bids received without explanation. No bid may be withdrawn for a period of 60 days. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. KFI Project Number: 21-0181.00 The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following: - Remove existing dehumidifier and makeup air unit in building basement. - Remove existing ductwork from systems no longer used. - Remove and retain for owner the existing split-system air conditioner in electrical room. - Two (2) desiccant dehumidifiers. - Two (2) condensing units. - Chemical room exhaust fans, louvers, registers and ductwork. - Backwash sludge sump cover and exhaust fan. - New ductwork, louvers, grilles and registers for exhaust and air handler systems. - Modify existing janitor's closet plumbing fixtures to construct a chase for ductwork routing. - Provide and install two (2) split-system air conditioners in the electrical room. - Provide and install standalone controls for each new and modified air system A. Summary Project Description: Removal of existing building dehumidifier and the installation of two (2) new building dehumidfiers.. B. Contract Scope: Construction, demolition, renovation, hazardous material removal, site acquisition, construction financing, and facility operations during occupancy

Post-Bid

Water / Sewer

$670,000.00

Public - City

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
173
Bidding Soon
1,555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2021

December 13, 2021

Project location map

11955 Champlin Dr, Champlin, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.