BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2022 at 8:00 PM

Updated February 20, 2024

Site work and paving for a mixed-use development in Champlin, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of April 19, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May of 2022. *The closed solicitation has been included below for reference: The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities. 33,000 S Y Remove Bituminous Pavement 16,000 S Y Full Depth Reclamation 24,000 L F Remove and Replace Concrete Curb and Gutter 34,000 C Y Excavation - Common (P) 18,000 C Y Select Granular Embankment (CV) (P) 5,000 TON Type SP 12.5 Wearing Course Mix (2,C) 6,200 TON Type SP 12.5 Non Wear Course Mix (2,C) 22,000 S F 4" - 6" Concrete Walk 32,000 S F 3" Bituminous Walk 19,000 L F 4" - 6" PVC Pipe Drain 5,000 L F 12" - 36" RCP Storm Sewer 12,000 L F Fiber Optic Trunk Cable 12SM-48SM 52,000 L F Underground Wire 1/C 8 AWG 3,000 S F Crosswalk Multi Comp. The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of Champlin shall comply with the provisions of the statute. The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. Immediately following expiration of the time for receiving bids, representatives of the City of Champlin will publicly view Bids at an online Bid opening meeting. Information and Bidding Documents for the Project can be found at Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from other sources.

Bid Results

Roads / Highways

$6,056,824.00

Public - City

Paving, Site Work

3

16

4

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
162
Bidding Soon
1,548
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

May 2, 2022

Project location map

Multiple Locations, Champlin, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.