Published July 5, 2022 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a mixed-use development in Opp, Alabama. Completed plans call for the construction of a two-story above grade educational facility; for site work for a educational facility; and office development.

Project No: 21.115-A NODCM, 21.115A NODCM The project shall be bid excluding taxes. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. No bid may be withdrawn after scheduled closing for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. A certified check or Bid Bond payable to Opp City Schools in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00 must accompany the bidder's sealed proposal. Performance and statutory labor and material payment bonds will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect. All bidders shall show such evidence by clearly displaying current license number on the outside of sealed envelope in which the proposal is delivered. All RFIs and RFAs regarding the bid documents shall be sent and addressed through emails found on the RFI and RFA forms in the project manual. NOTE: ONLY THE RFI AND RFA FORMS IN THE PROJECT MANUAL WILL BE ACCEPTED. The Architect will not accept inquiries via telephone or fax. Completion Time: Project to be completed within 45 days from notice to proceed. Supervision: Contractor to provide proper supervision for all work.

Post-Bid

Office

$450,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Natural Roof Coverings, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
23
Bidding Soon
450
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

img_map_placeholder

113 E Hart Ave, Opp, AL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Toilets Only for New School Board Office

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.