BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Jacksonville, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

***As of January 8, 2021, the project has been awarded for the amount of $85,981.85.*** : This is a Contract for utility cut repairs. Work to be performed under this Contract includes the repair of roadways, driveways and sidewalks damaged during the repair of utilities for the City of Jacksonville. Work includes, but is not limited to, materials, equipment and labor for repairing asphalt pavement and concrete structures such as driveways, curb and gutter, curb ramps and sidewalks. This will be a six (6) month contract The Jacksonville City Council reserves the right to waive any informalities, to reject any or all bids, and to accept that Bid or Bids which appear to be in the Owner's best interest. Bid Bond Not Required. The successful Bidder, upon award of contract, shall furnish a Payment Bond for 100% of the project price; and a Performance Bond for 100% of the project price. A Surety licensed to do business in the State of North Carolina must issue the Payment Bond and the Performance Bond. The Bonds will be executed by the signing of a Power of Attorney by the Surety and will list the Resident North Carolina Agent. If You Have Any Questions, or if You Would Like the Complete Bid Document, Please Contact Veronica Morphy Project Manager, City of Jacksonville, Email:vmorphy@jacksonvillenc.gov at (910) 967-1044 or Tdd (910) 455-8852. The Bidder further understands that if the work is not completed within the time specified, liquidated damages will be deducted from the compensation otherwise due him/her at the rate of Two Hundred Fifty Dollars_($250.00) per day for each day thereafter, Sundays and holidays included, that the work remains incomplete. a. This will be a six (6) month contract. b. The City will issue a written Work Directive to the Contractor listing the locations of the utility cuts within five (5) working days of the Notice to Proceed Date. The Contractor shall complete the Work Directive within 6 months of the Notice to Proceed date. Once the Work Directive is complete, the city may, with the Contractor's approval, issue an additional Work Directive list. c. The Contractor shall notify the Owner forty-eight (48) hours prior to beginning work or any halt to the work and upon completion. A halt to the work is defined as no measureable progress toward completion of the Work Directive list for three (3) or more days. Measurable progress is determined by COJ. If a halt to the work is necessary, the contractor must communicate with the COJ Inspector and Engineering department in writing by email. If no work has been completed for three (3) or more days and no written communication by email to the Inspector or the Engineering department has occurred, the City may collect liquidated damages at a rate of $250 per day and/or terminate the contract. Verbal communications will not satisfy this requirement. Deadline for question submittal is Wednesday, November 3, 2021 at 5:00 PM.

Award

Water / Sewer

$85,982.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
31
Bidding Soon
572
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2021

December 6, 2021

img_map_placeholder

Multiple Locations, Jacksonville, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.