Published April 10, 2023 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a mixed-use development in Davenport, Iowa. Completed plans call for the construction of a 4,377-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

The bids are for a single Prime Contract (civil, general, mechanical and electrical combined) for a new one (1) story, non-separated mixed use community center on the current property of the Davenport Public Library, Fairmount Street Branch. The stand-alone community center will be approximately 4,377 SF and include an entrance vestibule, lobby and reception area, private office, kitchenette, half-court sized basketball court, an open multi-purpose space, storage, utility, and restrooms. Awards of Contract is anticipated to commence on or about April 28, 2023. Work may begin immediately following execution of the agreement and is scheduled to be Substantially Complete by March 7, 2024, in one phase as shown on the Contract Documents. . Liquidated Damages of $500.00 per day will apply to this project. Liquidated damages will begin two weeks after the scheduled date of Substantial Completion and are further defined in the Contract Documents. A public hearing will be held at 226 W. 4th, Davenport, Iowa, at 5:30 p.m., on February 15, 2023, at which time and place any person could have appeared and filed objections to the proposed plans, specifications, form of contract, and the estimated cost of said project Bidders and Sub-bidders requiring interpretation of the bidding documents or substitution requests are required to make an electronic written request to the City's Purchasing Division by 5:00 p.m. local time, seven calendar days prior to the date for receipt of Bids Clarifications or modifications of the Bid Documents will be addressed via Addendum by 3:00 p.m. local time five calendar days prior to the date for receopt of Bids. Be advised that any conversation(s) in reference to this bid between bidders and any City employee, City official, or City Representative, outside of the Purchasing Division, during the entire competitive bidding process is strictly prohibited. Such actions will result in removal of the vendor from the bidder's list and rejection of the vendor's bid. The only official position of the City is that position which is stated in writing and issued by the Purchasing Division. No other means of communication, whether written or oral, shall be construed as a formal or official response statement. Direct all correspondence through the City's Purchasing Division. Correspondence sent to the Architect will be ignored. Bid security in the amount of 5% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond, is required for this project at the time of Bid. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum. Interested bidders shall complete all requirements and submit all documents via the website Nonresident bidders shall comply with Iowa Code Section 73A.21, subsection 4. In accordance with, Chapter 73A, Code of Iowa, when a contract for a public improvement is to be awarded to the lowest responsible bidder, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. In accordance with Chapter 156, Iowa Administrative Code the public body shall request a statement from each bidder regarding the bidder's resident status. The statement shall be on the form designated by the commissioner. The statement shall require the bidder to certify whether the bidder is a resident bidder or a nonresident bidder. In the case of a resident bidder, the statement shall require the resident bidder to identify each office at which the resident bidder has conducted business in the state during the previous three years and the dates on which the resident bidder conducted business at each office. In the case of a nonresident bidder, the statement shall require the nonresident bidder to identify the nonresident bidder's home state or foreign country as reported to the Iowa secretary of state, to identify each preference offered by the nonresident bidder's home state or foreign country, and to certify that, except as set forth on the form, there are no other preferences offered by the nonresident bidder's home state or foreign country. The award of the contract may be made by June 29, 2022 to any responsible bidder or bidders offering suitable supplies, equipment and/or service at the lowest price taking into consideration the quality of materials or service in the best interest of the Owner. The right is reserved to reject any and all bids, or any part thereof, and to waive informalities, and to enter into such contract or contracts as shall be deemed in the best interest of the Owner. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa.

Award

Clubhouse / Community Centers

$2,862,222.00

Public - City

New Construction, Site Work

89

29

50

8

Subscribe For Documents

103 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Cast Decks and Underlayment, Concrete Topping
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Membrane Roofing, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Firestopping, Joint Protection
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Stone Facing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
60
Bidding Soon
630
All Active Projects
347
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

May 1, 2023

img_map_placeholder

3000 N Fairmount St, Davenport, IA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fairmount Community Center

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.