Site work and paving for a road / highway in Stanley, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Contract Award Date: May 26, 2023 Contract Award Number: 1240LT23C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: QJ4ZMZ8JZAZ1 Contractor Awarded Name: Burks Excavation Corporation of Idaho Contractor Awarded Address: Bellevue, ID 83313 USA Base and All Options Value (Total Contract Value): $4,333,486.00 Requisition/purchase Request No - 1082296 Solicitation Posting Presolicitation Notice GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest DESCRIPTION OF WORK Project Description: Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will reconstruct existing paved/gravel roads, parking lots, and trails along Forest Road #214 within the Redfish Lake Recreation Complex. Work will occur at three primary locations as follows: Entrance Area ~2,150 lineal feet of new asphalt roadway from State Highway 75 to the Phase 1 project limits including a slight re-route to accommodate construction of a new 18-vehicle gravel Entrance Station parking lot and ~600 lineal feet of new gravel trail. Roundabout Area ~250 lineal feet of new asphalt roadway pullout including signing, striping, and barrier rock relocation. Remove three existing destination signs at the roundabout intersection for Forest Roads #214 and #214A and replace with six new destination signs having larger font, symbols, and more concise verbiage. North Shore Area ~3,110 lineal feet of new asphalt roadway from the Phase 1 project limits to the entrance of the Glacier View Campground including a re-route away from the lakeshore to accommodate construction of a new 28-vehicle paved Visitor Center parking lot and access roadway, and a new 44-vehicle paved North Shore parking lot and access roadway. ~1,775 lineal feet of new asphalt trail along the lakeshore (former FS Road #214 and service road/trail), including construction of a new underlying distribution waterline and various services. Reconstruct the North Shore Day Use Area including site amenities. Remove/Rehab/Recontour the existing Visitor Center / North Shore parking lots, a former paved service road, and various former road cut/fill sections to render these areas returned to their pre-developed state. Construction includes, but is not limited to, construction survey and staking, clearing and grubbing, extensive earthwork including excavation & embankment, rock/boulder removal, installation of drainage facilities consisting of culverts and roadside ditches, installation of new waterline piping, service connections, and other appurtenances, minor sanitary sewer manhole adjustments, signing, striping, existing asphalt and underlying aggregate base pulverizing, new asphalt road/parking/trail construction, and construction of other miscellaneous improvements as required. Project Location: From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road #214. This represents the point of beginning of the Entrance Area. From there proceed approximately 0.40 miles along the existing Forest Road #214 to the Chinook Bay Campground exit approach which marks the point of ending of the Entrance Area. From there, proceed approximately 1.20 miles along the existing Forest Road #214 to the Redfish Phase 1 limits which marks the point of beginning of the North Shore Area. From there, proceed approximately 0.60 miles along the existing Forest Road #214 to the Glacier View Campground entrance which marks the point of ending of the North Shore Area. Contract Time: The work anticipated under any contract resulting from this solicitation anticipated start date for administrative and construction preparation tasks- June 5, 2023 August 14, 2023 - anticipated start date for on-the-ground construction. The Project End Date will be October 31, 2024 The magnitude of proposed project is between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$4,333,486.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 9, 2023
May 1, 2023
October 31, 2024
State Hwy 75, Stanley, ID
Related To This Project
Stanley, ID
Bid Date: May 23 2022
Stanley, ID
Bid Date: Jun 07 2022
Stanley, ID
Bid Date: Jun 21 2023
Stanley, ID
Bid Date: Jun 14 2023
Stanley, ID
--
Stanley, ID
Bid Date: Jun 15 2021
Stanley, ID
Bid Date: Jun 14 2024
Meridian, ID
--
Lewiston, ID
Bid Date: Oct 12 2022
Boise, ID
Bid Date: Oct 24 2022
Boise, ID
--
Idaho Falls, ID
--
Caldwell, ID
Bid Date: Oct 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--