EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Stanley, Idaho. Completed plans call for site work for a road / highway.

Amendment 0002 added- Please see attachments for Q&A's * Site visit is scheduled for May 28, 2024 at 11:00 AM Mountain Time. P.O.C. for this is Sharon Kosmalski at sharon.kosmalski@usda.gov.* Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor's initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56. Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-07 and attached road logs). *PLEASE SEE ATTACHMENTS FOR SOLICITATION ALONG WITH THE ATTACHMENTS* MAGNITUDE OF CONSTRUCTION PROJECT : $1,000,000 - $5,000,000 All questions are due via email to the POC listed in block 10 by 1:00 PM Central Time on 31 May 2024. Period of Performance: 07/05/2024 to 08/31/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding this amendment please contact: Erick Plamann Contract Specialist erick.plamann@usda.gov

Post-Bid

Roads / Highways

$5,000,000.00

Public - Federal

Site Work

17

5

2

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
9
Bidding Soon
101
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2024

July 5, 2024

img_map_placeholder

To Be Determined, Stanley, ID


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.