BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Miami, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of July 5, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 06 Selection Method : Letter of Response and Interview SR 90/Tamiami Trail/ SW 8th St from Beacom Blvd. to SW 4 Ave TRC Members (Subject to Change) : Carlos Echeverria Carmen Negron Hector Di Donato Financial Management Number(s) 446000-1-32-01 The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: Wednesday, December 08, 2021 Tentative Interview Date: Thursday, December 9, 2021 Longlist Date/Time 11/10/2021 12:30 am Shortlist Selection Date/Time 11/15/2021 08:30 pm Phase II Submittal Deadline Date/Time 12/09/2021 01:30 am Consultant Interviews Date/Time 12/09/2021 Final Selection Date/Time 1/03/2022 08:30 pm Negotiations Period Begin Date 1/11/2022 Negotiations Period Ending Date 3/01/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 90/Tamiami Trail/ SW 8th St from Beacom Blvd. to SW 4 Ave

Conceptual

Roads / Highways

$3,295,687.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
51
Bidding Soon
1,107
All Active Projects
455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.