Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 10, 2022 at 7:00 PM
Updated December 17, 2024
Site work for a water / sewer project in Tuscaloosa, Alabama. Completed plans call for site work for a water / sewer project.
The Project shall be known as Campus Area Water Distribution System and Instrumentation Upgrades Proposal C Water Distribution System Improvements and the general character of said public works project shall consist of the following: Water Distribution Main Improvements and 420/360 System Isolations. The approximate quantities of said Project are as follows: 1,150 LF 24 D.I. Water Main, 8,600 LF 16 D.I. Water Main, Valves, Fittings, Fire Hydrant Assembly, Main Connections, System Isolation Valves. The University of Alabama Utility and Infrastructure Improvements consists of street, sidewalk, curb, electrical / OIT improvements, site lighting, and appurtenances. Any questions concerning the pre-bid conference shall be directed to R. Allen McGiffert, he can be reached at (205) 759-1521. Special instructions are as follows: Please note documentation required by SRF funding all instructions and forms are included within the bid package. 2021 Special COVID-19 Requirements: Due to the recent events associated with the Coronavirus the following requirements will be enforced during the Pre-bid Meeting and Public Bid Opening: 1. Only one representative for a bidder shall attend the pre-bid meeting and bid opening. 2. All those attending any meeting shall be healthy and not display any symptoms of sickness. 3. All those attending the Pre-Bid Meeting and Bid Opening shall comply with all Federal, State, and City of Tuscaloosa requirements associated with the virus COVID-19 (Coronavirus). It shall be mandatory that all bidders submitting a bid attend the Pre-Bid Conference. If the BIDDER fails to have a company employee present at the mandatory pre-bid conference, bidder shall return contract documents, specifications, and construction plans immediately to the ENGINEER Time of Construction: From the date stated in the Notice to Proceed, the Project shall be constructed based on the Sequence of Construction Schedule as follows: Distribution System Improvements Completed by August 1, 2022 The University of Alabama Improvements Completed by August 1, 2022 System Conversion Completed by September 30, 2022 Any failure to complete such construction tasks outlined in the above Construction Schedule shall constitute liquidation damages charges Award of the contract will be made within forty-five (45) calendar days from the date of the bid opening. The City reserves the right to reject all bids and/or reject and rebid the Project should it determine the same is in the best interest of the City
Post-Bid
Water / Sewer
$600,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2022
February 14, 2022

To Be Determined, Tuscaloosa, AL
Related To This Project
Tuscaloosa, AL
Bid Date: Feb 23 2022
Tuscaloosa, AL
Bid Date: Jan 11 2022
Tuscaloosa, AL
Bid Date: Feb 10 2022
Tuscaloosa, AL
Bid Date: Jan 26 2022
Tuscaloosa, AL
--
Tuscaloosa, AL
Bid Date: Jan 27 2022
Tuscaloosa, AL
Bid Date: Feb 08 2022
Tuscaloosa, AL
Bid Date: Feb 01 2022
Tuscaloosa, AL
Bid Date: Jan 18 2022
Tuscaloosa, AL
Bid Date: Jan 19 2022
Tuscaloosa, AL
Bid Date: Jan 21 2022
Tuscaloosa, AL
Bid Date: Jan 27 2022
Tuscaloosa, AL
Bid Date: Jan 27 2022
Tuscaloosa, AL
Bid Date: Jan 25 2022
Tuscaloosa, AL
Bid Date: Dec 02 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock the Competitive Edge in Every Bid.
Data that works as hard as you do. Win more jobs with data-backed targeting, precise project insights, and alerts that keep you one step ahead.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Campus Area Water Distribution System and Instrumentation Upgrades - Proposal C - Water Distribution System Improvements
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.