BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Maple Plain, Minnesota. Completed plans call for the renovation of a educational facility.

This project will be a mechanical system improvement project along with minor architectural improvements that relate to the HVAC work. The intent is to convert the existing steam heating plant to hot water and subsequent piping, coils, controls, and air handling to deliver an updated ventilation system. This work will also include the addition of new vertical unit ventilators, a new air handling unit and a new condensing unit as well as an update to the domestic water plant. This Section describes the limits of the requested alternates to the Contract work. Refer to the Product/Execution Articles of the appropriate Specifications and the Drawings for information pertaining to the work of each alternate. Each proposal under an alternate shall include all incidental work and all adjustments necessary to accommodate the changes. All work shall meet the requirements of the Drawings, Specifications and appropriate details. Submit each alternate proposal as an individual cost for the particular alternate and shall be proposed under the premise that no other alternates have been accepted. Should the work of an alternate called for by the Bid Form not affect the cost of the work, state "No Change" in the space provided. If an alternate is left blank, the Owner reserves the right to throw out the entire bid or interpret the alternate as "No Change". Include taxes which are applicable to work involved in alternates as well as costs, if any, for increased coverage of bonds and insurance. Any of the alternates may be accepted by Owner and will be used in determining the low bidder. Owner may, at their option, vary the scope of the work by authorizing alternates which will add to the work, deduct from the work or substitute materials, equipment or methods. Each Bidder shall examine the Drawings and Specifications to determine the extent to which their work is affected by bid alternates. Include in the space provided on the bid form the cost of any added or deducted work resulting from each alternate. Contractor is responsible for providing work if applicable to each alternate, whether or not an added or deducted cost is included on their bid form.

Award

Educational

$2,313,000.00

Public - County

Renovation

53

24

78

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
86
Bidding Soon
795
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

March 14, 2022

img_map_placeholder

5050 Independence St, Maple Plain, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.