Demolition, site work, paving and new construction of a bridge / tunnel in Happy Camp, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Award Details Contract Award Date: Apr 25, 2022 Contract Award Number: 6982AF22C000020 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Hooker Creek Inc Contractor Awarded Address: Red Bluff, CA 96080 USA Base and All Options Value (Total Contract Value): $2397777.00 The Klamath National Forest (KNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season. The US Forest Service (FS) is requesting that the Central Federal Lands Highway Division (CFLHD) perform engineering and construction services to replace the Upper Doolittle and Mill Creek Bridge structures utilizing Emergency Repair for Federally Owned Roads (ERFO) funds. The Upper Doolittle Creek Bridge is located approximately 5.9 miles Northwest of Happy Camp on Forest Route 17N11 within Klamath National Forest in Siskiyou County, CA. The Mill Creek Bridge is located approximately 15.3 miles Northwest of Happy Camp on Forest Route 18N15 within Klamath National Forest in Siskiyou County, CA. Site Visit (Construction). (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) Site visits may be arranged during normal duty hours by contacting: No organized B-11 site visit will be held. The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than {Refer to Subsection 108.01 of the SCRs}. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by May 16, 2022. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.The CO may grant written approval for exemptions to scheduled days off for specific project operations and for periods of limited duration. Add the following: The CO will issue a Notice to Proceed before commencement of any work. The contract completion date is October 27, 2022. Request for Technical Information - Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3). TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON MARCH 30, 2022 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A. Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov. FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov . Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs. Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15 Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-14. Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee (Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FPItem 19: Item 24: ESTIMATED PRICE: 14. All bid guarantees must have original signatures with original corporate seals. ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to https://sam.gov. SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the FP-14. The price range of the project work is between $2,000,000 and $4,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$2,397,777.00

Public - Federal

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
86
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2022

May 18, 2022

img_map_placeholder

Multiple Locations, Happy Camp, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.