BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated January 30, 2026

Site work and new construction of a power facility in Happy Camp, California. Completed plans call for the construction of a power facility; and for site work for a power facility.

The project requires a new 125kw propane emergency generator unit. The bid must include: a new propane-fueled 125 kW generator with a lockable enclosure, appropriately sized fuel tank or tanks and all necessary plumbing, block heater, battery, flexible connector, standard controls, auto-switching gear, all freight to the jobsite, full installation (including gas lines and wiring), and start-up (load test, fuel adjustments).

GC Bidding

Chemical Power Generation

$200,000.00

Public - Federal

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
15
Bidding Soon
136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

March 16, 2026

Project location map

64105 Hillside Rd, Happy Camp, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.