BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Lansing, Michigan. Working plans call for the renovation of a municipal facility.

***As of February 7, 2022, the project will rebid. A timeline for a rebid has not yet been determined.*** REPAIR AND REDESIGN OF HVAC SYSTEM AT CITY OFFICE 316 N CAPTIOL AVE, LANSING MI. Questions are submitted online No Closing Date 12/08/2021 10:00 AM EST - Bid Deposit Required - Insurance Required - Local Service Required - Warranty Information Required 1. Review existing heating systems within Suites C and D, includingradiators. 2. Engineer and install a return air duct system utilizing metal ductwork, sized to provide adequate return air for optimal function of heating system. Return air system shall be installed above existing finished ceiling and include new return air grilles compatible with ducts and the existing finished ceiling. 3. Inspect and assess existing supply duct system, make required repairs for proper operation and distribution. Ensure that fire suppression system above existing finished ceiling has adequate heat to prevent freezing after return air duct system is installed (currently the area above the drop ceiling acts as the return air plenum). 4. Furnish and Install a new, properly sized commercial high efficiency air filter designed to filter particulate matter (PM), chemical pollutants and biological contaminants. Size and installation per manufacturers written specifications so warranty is ineffect. 5. Furnish and install a new, properly sized commercial UV air purifier that uses UV-C light technology. Size and installation per manufacturers written specifications so warranty is in effect. 6. Clean existing supply air ducts and grilles and return airgrilles. 7. Clean existing bathroom ventilation ducts and grilles (4 bathrooms total, 2 in Suite C and 2 in Suite D. 8. Furnish and install all materials required to protect employee work areas and office furnishings from dust, debris, damage and dirt during construction. 9. Protect and reinstall all ceiling tiles and grid removed to complete specified work 10. Include all required permits.

Final Planning

Municipal

$58,467.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
101
Bidding Soon
1,352
All Active Projects
577
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2021

August 7, 2022

img_map_placeholder

316 N Capitol Ave, Lansing, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.