BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Buckeye, Arizona. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Design and construction of the southern half of Roeser Road from Rooks Road west approximately 1/4 mile along the northern boundary of the Farallon Water Campus. Roeser Road is designated as a Collector roadway (City Detail 63150). Design and construction of the western half of Rooks Road from the Roeser Road alignment approximately 1/8 miles south along the eastern boundary of the Farallon Water Campus. Rooks Road is designated as an Arterial roadway (City Detail 63130). As October 25, 2022, this project is currently in the FY 2022-2023 Capital Improvement Plan. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024-2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
32
Bidding Soon
1,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

Multiple Locations, Buckeye, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.