BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work and paving for a civil project in Buckeye, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The City intends to procure a Construction Manager at Risk (CMAR) to construct the roadway improvements for the Improvements to Verrado Way and Yuma Road Intersection, North to Van Buren Street project. The following is a general summary of the project and is not intended to be a comprehensive scope of work. The most qualified Construction Manager at Risk (CMAR) team that can demonstrate experience in all the following areas will be selected to prepare a more comprehensive and complete scope of work as an exhibit and portion of their Construction Manager at Risk contract The Construction Manager at Risk (CMAR) will provide preconstruction and construction services for the road improvements along Verrado Way, from the intersection at Yuma Road north to Van Buren Street, approximately one mile. The contractor will furnish all labor, materials, equipment and services to complete the work. The project includes designing and constructing a 4-lane roadway-two lanes in each direction-with a center turn lane and will incorporate both interim and ultimate conditions. A comprehensive drainage analysis and report will be completed to support the design of a raised median and ensure long-term stormwater management. The CMAR will also oversee the final design and construction of ultimate intersection improvements at Verrado Way and Yuma Road, including full halfstreet improvements for the parcel on the southeast corner. Coordination with design teams, utility companies, and stakeholders will be essential to ensure timely delivery and quality construction. Deadline for Questions April 30, 2025, at 3:00 PM local time

Award

Roads / Highways

$3,940,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

January 8, 2026

Project location map

N Verrado Way, Buckeye, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.