Site work for a mixed-use development in San Diego, California. Completed plans call for site work for a educational facility.

Mandatory site visits are scheduled for projects in Group 2A , outside the main office of Encanto Elementary School, 822 65th Street, San Diego, CA 92114. Upon completion, all contractors will proceed to Nye Elementary School, 981 Valencia Parkway, San Diego, CA 92114. Upon completion, all contractors will proceed to Horton Elementary School, 5050 Guymon Street, San Diego, CA 92102. Upon completion, all contractors will proceed to Chollas Mead Elementary School, 401 North 45th Street, San Diego, CA 92102. Upon completion, all contractors will proceed to César Chavez Elementary School, 1404 South 40th Street, San Diego, CA 92113. Mandatory site visits are scheduled for projects in Group 2B outside the main office of Green Elementary School, 7030 Wandermere Drive, San Diego, CA 92119. Upon completion, all contractors will proceed to Dailard Elementary School, 6425 Cibola Road, San Diego, CA 92120. Upon completion, all contractors will proceed to Hearst Elementary School, 6230 Del Cerro Blvd., San Diego, CA 92120. Upon completion, all contractors will proceed to Jerabek Elementary School, 10050 Avenida Magnifica, San Diego, CA 92131. Upon completion, all contractors will proceed to Miramar Ranch Elementary School, 10770 Red Cedar Drive, San Diego, CA 92131. CONTRACTORS MUST BE PRESENT AT ALL 10 SITES IN ORDER TO BID THIS PROJECT. ALL CONTRACTORS MUST PREREGISTER WITH THE DISTRICT PRIOR TO ATTENDING THE SITE WALK The project estimate is between $1,000,000 and $1,200,000. This is a PSA project and requires prequalification. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: B or other appropriate license, subject to District approval. Payments shall be made by check payable to SAN DIEGO UNIFIED SCHOOL DISTRICT. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to Crisp Imaging within ten (10) days of the issuance of the Final Bid Tabulation

Bid Results

Educational

$1,058,543.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

24

Subscribe For Documents

147 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
59
Bidding Soon
758
All Active Projects
384
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2021

January 14, 2022

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Furnish and Install Shade Shelters at 10 District Sites, Group 2A and Group 2B

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.