BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Kingman, Arizona. Completed plans call for the construction of a 30,000-square-foot educational facility; for site work for a educational facility; laboratory facility; and laboratory facility.

The owner has selected a Construction Manager. The Advanced Manufacturing Training Center - AMTC Project will be a +/- 30,000 square foot building located within the current 1,300-acre manufacturing/industrial center in Kingman, AZ. The AMTC will offer curriculum for vocational training as well as manufacturing and industry student training equipment.This project will provide incentive for new businesses to re-locate to Arizona, as well as support state economic growth in manufacturing industries with a high-quality skilled labor pool. The project budget allocation is estimated at 12.5 Million Dollars. This represents the total amount available for project development including: new construction, site work, utilities, furniture and equipment and fees. The construction budget range the architect shall use for planning the facilities is $9 million. This final budget shall not be changed except by written notice from the Director of Facilities Management to the architect. Mohave Community College (MCC) wishes to build a + / - 3 0 , 0 0 0 S Q F T training center on Parcel V-P- C-A, Kingman Industrial Airport Park, Sections 26 & 27, T22N-R16W, G&R Meridian, Mohave County Arizona (see Exhibit A) near the proposed Rancho Sante Fe Interchange of I-11. The AMTC uses envisioned include but are not limited to: Electrical Lab, Manufacturing Lab, Mechanical/Electromechanical Lab, Hydraulics/Pneumatics/PLC/Process Control Lab, HVAC Lab, Robotics Lab, SIM and VR Lab, Instruction/Computer Design lab, Large and Small Classrooms, Conference Space, Pre-Function Space, Reception Area/Lobby, Coffee Shop/Café Space and Kitchen, Career Center/Interview/Testing Rooms, Administrative Offices, Restrooms, Storage Room, and Ancillary/Support Spaces. MCC will not be seeking LEED certification for this project but systems are to be designed to be as energy efficient as is practical and possible. Inclusion of HVAC, Solar, Wind and other systems that will support the building and aid in hands-on training will be advantageous. Q & A Addenda Posted March 1, 2023 Select Architect June 2022 Select CMAR April 2023 Execute CMAR Agreements April 2023 Programming Design & Construction Documents April - September 2023 Bidding & GMP October 2023 Governing Board Approval of GMP October 2023 Notice to Proceed October 2023 Construction October 2023-October 2024 Owner Installed Components October 2024 Probable Occupancy October 2024 Open for Spring Semester 2025 November/December 2024 Warranty Period: Two years from Project Substantial Completion All questions regarding this RFP shall be submitted to: Christine Van Vleet, Director of Procurement (928) 757-0819 email to: cvanvleet@mohave.edu Questions must be sent by mail or e-mail. Questions will only be accepted until close of business on Monday, FEBRUARY 27, 2023. We will not respond directly to the company asking the question. Questions will be answered in the form of an addendum and sent to all potential respondents on/about Wednesday, MARCH 1, 2023

Award

Educational

$12,500,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
41
Bidding Soon
594
All Active Projects
272
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 23, 2023

October 2, 2023

img_map_placeholder

To Be Determined, Kingman, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.