BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2022 at 7:00 PM

Updated August 21, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Clutier, Iowa. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project Id : 211116 S1 Counties : Tama Working Days : 115 Bros-swap-c086(102)--se-86 Route: P Avenue On P Ave, Over North Walnut Creek, From 400th Street North 0.75 Miles, S33 T82 R14 Estimated Value : $750,000 - $1,000,000 Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to Execute a Contract and File an Acceptable Performance Bond and Certificate of Insurance Within 30 Days of the Approval Date for Awarding the Contract Will Be Just and Sufficient Cause for the Denial of the Award and Forfeiture of the Proposal Guaranty. On Federal-aid Projects, Where Disadvantaged Business Enterprise (Dbe) Goals Have Been Established, the Bidder Is Required to Complete and Submit Form 102115 With the Bid Documents. On All Projects Without Dbe Goals, the Contractor Must Show That Affirmative Action Has Been Made to Seek Out and Consider Dbes as Potential Subcontractors. Minimum Wage Rates for All Federal-aid Projects Have Been Predetermined by the U.s. Secretary of Labor and Are Set Forth in the Specifications. However, This Does Not Apply to Projects Off the Federal-aid Highway System. All Federal-aid Projects Are Subject to the Contract Work Hours Standards Act, as Amended (Title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and Implementing Regulations. The Iowa Dot Reserves the Right to Waive Technicalities and Reject Any or All Bids. Iowa Dot - Bid Order Number: 023 - Bridge Replacement - CCS *The Value for This Project Is Based on a Financial Range. The Value Is Listed as the Highest Possible Cost From the Range Provided by a Stakeholder or Official Project Document.

Award

Bridges / Tunnels

$925,596.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

21

3

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
121
Bidding Soon
1,469
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2021

May 9, 2022

Project location map

P Ave, Clutier, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.