Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Boston, Massachusetts. Completed plans call for the renovation of a transportation facility.
Installation and completion, in every aspect, of replacement security system user interface components (monitors, computers, uninterruptible power supplies, keyboards, mice and associated cabling) at the MBTA Hub Centers in stations and facilities Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Provide for the installation and completion, in every aspect, of replacement security system user interface components at MBTA Hub Centers and Stations . ##F-20 Worksite Locations o 45 High Street, Boston, MA o Airport Station - Transportation Way and Service Rd., East Boston, MA o Back Bay Station - 145 Dartmouth St., Boston, MA o Harvard Station - 1400 Massachusetts Ave., Cambridge, MA o North Station - 135 Causeway St., Boston, MA o South Station - 700 Atlantic Avenue, Boston, MA o State Transportation Building - 10 Park Plaza, 4 th Floor, Boston, MA . The Contractor shall work with the MBTA Security and Emergency Management (SEM) Department for the procurement, installation, configuration, programming, set-up, commissioning, testing, and maintenance of the new Hub Center Security System User Interface items, and the disposal of the legacy equipment. B. The Contractor shall provide a Project Manager (PM) and a Project Manager's Representative (PMR) as a single point of contact, who will be available to speak with the Authority twenty-four (24) hours per day, seven (7) days per week, for the duration of the project, for the purpose of administering this Contract. C. The new items including monitors, computers, IP intercoms, uninterruptible power supplies (UPS), extenders, cables, keyboards, and mice shall be as described herein and as shown on the Contract Drawings. D. The new items shall be installed per manufacturer's recommendations at existing locations as shown on the Contract Drawings. Monitors shall be mounted with similar orientation to those being replaced. E. Where possible, the Contractor shall utilize the existing overhead monitor mounts. Where existing mounting components cannot be used, replacement components shall be provided by the Contractor as required. New components shall be designed by the manufacturer for the sole purpose of pendant mounting monitors of the type and size provided The newcomponentswillreplaceobsolete itemsat a single workstation in eachHubCenter.The equipment at the second Hub Center workstation shall be removed and will not be replaced. New components shall also be provided to replace existing equipment at two workstations in the 10 Park Plaza Hub Center.The Contractor shall provide two new video client workstation computers at the Security Operations Center, alongwith spare components.Theworkshall also include theinstallationof ancillary equipment asrequired to provide a complete,functionalsystem at each location. Construction documents as follows: 2.1.1 MBTA Hub Center UserInterfaceReplacement Scope of Work Rev0_Solicitation Set - Attached in COMMBUYS. 2.1.2 MBTA Hub Center UserInterface Replacement Executive - Attached in COMMBUYS 2.1.3 MBTA Hub Center UserInterfaceReplacement Drawing Package Solicitation Set - Attached in COMMBUYS 2.1.4 MBTA Hub Center UserInterfaceReplacement Contractor Bid Requirements - Attached in COMMBUYS 2.1.5 MBTA Hub Center UserInterfaceReplacement CDRL List - Attached in COMMBUYS.
Post-Bid
Transportation Terminals
$300,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2021
December 28, 2021
Multiple Locations, Boston, MA
Related To This Project
Boston, MA
Bid Date: Nov 22 2021
Boston, MA
Bid Date: Dec 01 2021
Boston, MA
Bid Date: Dec 15 2021
Boston, MA
Bid Date: Apr 05 2019
Boston, MA
Bid Date: Dec 07 2021
Boston, MA
Bid Date: Jan 06 2022
Boston, MA
--
Boston, MA
Bid Date: Jan 05 2022
Boston, MA
--
Boston, MA
--
Boston, MA
Bid Date: Jan 12 2022
Boston, MA
--
Boston, MA
Bid Date: Dec 14 2021
Boston, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.