BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Durant, Oklahoma. Completed plans call for site work for a water / sewer project.

Contract No. 1 - Mockingbird Lane Water System Improvements and Appurtenances consisting of construction and installation of approximately 24,000 L.F. of eight (8) inch new waterline, valves, hydrants, and appurtenances to replace the existing system waterline All bids must include assurances that the following provisions will be complied with: 1.Federal Labor Standards Provisions, US Department of Labor, 29 CFR 5; 2.Section 3 of the Housing and Urban Development Act of 1974, as amended; 12 U.S.C. 1701U, which requires that, to the greatest extent feasible, opportunities for training and employment be given lower-income residents of the project area and contracts for work in substantial part by persons residing in the area of the project; 3. Section 109 of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin or sex, be excluded from participation in, be denied the benefi ts of or be subjected to discrimination; 4. Certification of Non-Segregated Facilities, which assures the bidder does not maintain or provide any segregated facilities; comply with the terms of Section 504 and the American with Disabilities Act 5. Equal Opportunity Provisions - Executive Order 11246, as amended, which assures non-discrimination; 6. Minority Business Enterprise and Women Business Enterprise provisions which encourage minority-owned business and women-owned businesses to bid on the project; 7. Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. 8. System for Award Management (SAM) registration and a DUNS number is required for CDBG Bidders (Prime contractors) in order to be awarded projects by the CDBG program.

Award

Water / Sewer

$832,550.00

Public - County

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
91
Bidding Soon
2,103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2021

December 20, 2021

Project location map

W Mockingbird Ln, Durant, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.