BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Question Acceptance Deadline 02/21/2023 04:00 PM EST Questions are submitted online No The Work to be performed under the 2023 Water System Improvement Project consists of furnishing all labor, materials equipment, tools, supplies including the installation of new water line replacement/lining which covers approximately 11,000 LF of 6" & 8" diameter water distribution lines including valves, fittings, fire hydrants, and residential & commercial water service line re-connections at locations within the City of Aurora. Replacement Area 1 - 11th Ave (Del Mar Pkwy to Nome St) - 1,100 ft This section contains 6" Cast Iron Pipe built in the 1950s. This line has/had multiple breaks over the years. This pipeline is in a vicinity of a school and other critical facilities. Note: This section will only entail 700 lf+/- of R&R between (Del Mar & Jamaica) and then involve cross street tie-ins only between Jamaica & Nome St. Replacement Area 2 - Montview Blvd (From Havana to Peoria) - 4,221 ft This is a 6" CIP line that was built in the 1950s. It runs through a busy road and next to a school among other critical and commercial facilities. This line had multiple complicated breaks in the past. Replacement Area 3 - 25th Ave (From Havana to Peoria) - 5,751 ft This is an 8" CIP line that was built in the 1950s. It runs through a busy road and in vicinity of commercial properties as well as new development The opinion of probable cost for the Work is estimated to be between $6,500,000 and $7,000,000. All questions shall be submitted in writing to John Bruneau, Project Manager, via email at jbruneau@auroragov.org AND Nathan Jones, Contract Administrator, via email at njones@aurora.gov.org. Telephone inquiries will be accepted only for procedural questions by calling Nathan Jones at 303-739-7343. Questions are due by 2:00 p.m., local time, February 21, 2023. Responses will be posted via addendum posted to BidNet.

Post-Bid

Water / Sewer

$7,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
111
Bidding Soon
1,622
All Active Projects
688
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 2, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.