BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2021 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Arlington, Virginia. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The project includes abutment repairs to three bridges along the W&OD Trail in Arlington, VA. The Trail runs along Four Mile Run and crosses the run at several locations. Five percent bid bond or certified check is required for all bids over $500,000. All bids and bid bonds shall remain valid for ninety days. Performance and Labor and Material Payment bonds shall be required of the successful bidder for all contracts awarded over $500,000. The Contractor will be allowed to start the project after January 1, 2021, and will be given 60 days to complete the work on Bridge #4. Questions concerning this project shall be directed to the attention of Tim Geisler, NOVA Parks Project Manager. All questions regarding the project or bid shall be in writing and can be sent via email to tgeisler@nvrpa.org All interested Bidders should formally register with NOVA Parks by contacting Kiley Christian via email at kchristian@nvrpa.org or by calling 703-359-4626. The Authority reserves the right to reject any and all bids when such rejection is in the interest of the Authority, and will reject the bid of a bidder who is not a responsible bidder. The Contract will be awarded as soon as possible to the lowest responsive and responsible bidder, provided its bid is reasonable and it is in the interest of the Authority to accept it. The Authority reserves the right to waive any informality in bids received when such waiver is in the interest of the Authority; also to accept any item in the bid unless otherwise specified by the Authority. If the work is not completed within the time required, as that may be adjusted by change orders, there shall be imposed on the Contractor liquidated damages of $200. 00 per day for each day beyond the contract time it takes to complete the work.

Bid Results

Bridges / Tunnels

$254,905.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
207
Bidding Soon
2,935
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2021

January 1, 2022

Project location map

Multiple Locations, Arlington, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.