BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Turtle Lake, Wisconsin. Working plans call for the renovation of a water / sewer project.

As of October 31, 2022, an engineer has been selected and this project is in the final planning phase. It is anticipated bidding will commence late December 2022 or early January 2023. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Request Category Code: Wastewater Treatment Description: The Village of Turtle Lake has elected to pre-select an equipment supplier for a Membrane Bio-Reactor System, included as part of the Wastewater Treatment Plant (WWTP) Upgrade with Membrane Bio-Reactor (MBR) project. The selection procedure will be used to determine the most responsible qualified supplier that will be collaborated with during design and listed in the construction contract specifications for the Membrane Bio-Reactor System equipment. Paper/hard copy packages are to be delivered to the Turtle Lake Village Hall at the address listed below. Deliver three (3) copies of the qualification package to the following address: Turtle Lake Village Hall Attn: Cory Davis 114 Martin Ave East Turtle Lake, WI 54889

Final Planning

Water / Sewer

$5,700,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
45
Bidding Soon
751
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2023

img_map_placeholder

520 Logan Ave E, Turtle Lake, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.