BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Belmont, California. Design plans call for site work for a water / sewer project.

As of June 25, 2024, no building permits have been submitted. This project is with the City of Belmont's public works department. The architect has been identified and the identity of the general contractor remains unknown. A firm construction timeline has not been established; however, construction could begin in 2025. Closed solicitation has been included below for reference. ……………….. The City of Belmont Public Works Department is seeking to retain one qualified licensed professional firm to perform design, environmental compliance, and permitting services to execute a bid package for the Belmont Creek Restoration project. Qualified consultants shall have, for similar projects, demonstrated success in project management, biological and riparian habitat restoration, engineering design, hydraulic modeling, geotechnical engineering, bank stabilization, stream bed restoration, construction plans and specifications, preparing documentation to satisfy the California Environmental Quality Act (CEQA), securing environmental regulatory permits, and public outreach. The Belmont Creek Restoration project will help to alleviate downstream flooding and sedimentation, improve the health of Belmont Creek (Creek), return a portion of the creek to a more natural condition, allow for connection to a stormwater detention basin, and increase its stewardship by achieving the following goals: o Stabilize the Creek's banks and channel using existing vegetation, trees and state of the practice methods for bank stabilization and stream bed improvement. o Reduce the accumulation of sediment and debris downstream. o Improve water quality. o Construct portions of a diversion facility to route and clean polluted creek water through a future detention basin (Twin Pines Park Storm Water Detention Basin project- simultaneously released RFP) o Increase native riparian habitat. o Educate and engage the community in the Creek's stewardship. The method of contractor selection has not been determined at this time.

Design

Water / Sewer

$983,783.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
82
Bidding Soon
1,654
All Active Projects
711
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

img_map_placeholder

1 Twin Pines Ln, Belmont, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.