Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published December 29, 2021 at 7:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Fort Collins, Colorado. Completed plans call for site work for a water / sewer project.
The Contract Documents provide for the construction of Bid 9452 Timberline Pedestrian Underpass & Mail Creek Ditch Improvements. The Work consists of Installation of a new 10'x14' precast (or CIP (Cast In Place) box culvert for the Mail Creek Trail at Timberline Road. The removal of an existing 4'x8' box culvert with replacement of a new precast (or CIP) 4'x8' box culvert at the Mail Creek Ditch. This work includes demolition, shoring, supply/installation of prefabricated box culverts (or install CIP box culverts), earthwork, erosion control, underdrain system, waterline work, curb/gutter, sidewalks, asphalt pavement, pedestrian railings, form liners, electrical/ lighting, and traffic control. The work will need to be completed in the winter of 2021/22. This project will be funded with local funds. This project will require close coordination with a separately bid federally funded Timberline widening (Stetson Creek to Zephyr Road) project. Construction phasing plans will need to always maintain 2-way traffic on Timberline. Phasing requirements will need the contractor to complete construction on the east half of both structures first, then shift traffic onto the newly constructed east half, then lastly build the west half of both structures. Mail Creek Ditch Co. requires Mail Creek Ditch to be ready to receive irrigation water no later than April 15, 2022. Please see attached ITB document for submittal information. Question Acceptance Deadline 11/08/2021 07:00 PM EST Questions are submitted online No
Under Construction
Water / Sewer
$2,716,593.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2021
December 17, 2021
Multiple Locations, Fort Collins, CO
Related To This Project
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Jan 26 2022
Fort Collins, CO
Bid Date: Jan 26 2022
Fort Collins, CO
Bid Date: Nov 14 2023
Fort Collins, CO
Bid Date: Oct 04 2023
Fort Collins, CO
Bid Date: Mar 31 2022
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Mar 30 2022
Fort Collins, CO
Bid Date: Oct 03 2023
Fort Collins, CO
Bid Date: Oct 03 2023
Fort Collins, CO
Bid Date: Mar 07 2022
Fort Collins, CO
Bid Date: Mar 07 2022
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Mar 10 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed