BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2022 at 8:00 PM

Updated March 15, 2025

Renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

This Specification and the accompanying Contract Drawings are intended to include the furnishing and installation, in a workman-like and approved manner, of all labor, materials, equipment and appliances necessary and required to completely install the HVAC Systems as specified and shown on the Drawings. General scope of work shall be as listed below, however, omission of specific items shall not be construed as being omitted from the Contract if the item is mentioned elsewhere or implied. The list is not intended to be complete, but it is to serve as a guide to the character and extent of the work, and in general, shall consist of the following: 1. Cleaning of all duct systems prior to operation. 2. All electrical interlock wiring, except as noted otherwise. 3. Complete DDC control and BAS system. 4. All control and interlock wiring (in conduit) for the BAS loop system and all components. 5. All miscellaneous appurtenances, accessories and specialties required for a complete installation placed into satisfactory operating condition. 6. Signs, charts, labels, etc., conforming to the requirements of the specifications, codes and Authorities Having Jurisdiction. 7. Exhaust ventilation systems including fans, ductwork, motors, dampers, air distribution devices, dampers, and all accessories. 8. Motor starters, motor control centers and variable frequency drives (VFD) for the for mechanical equipment as specified and/or scheduled 9. Power and control wiring to all terminal devices. 10. Provisions for temporary utilities as required to keep existing systems operational. 11. Prime painting of equipment and piping, shop finishes, piping identification, stenciling and color coding. 12. Training, instructions and guarantees. 13. Auxiliary steel required for supporting HVAC equipment, ductwork and piping other than those available in the building structure. 14. Access doors and panels required in acoustical tile hung ceilings and furnishing of all access doors and panels required in plaster or dry wall ceilings and partitions. 15. Duct cleaning. 16. Testing, Adjusting, Balancing and Commissioning. 17. Install duct smoke detectors furnished by Electrical Contractor. 18. Protection during construction. 19. Preliminary Balancing/Testing effort. 20. 120 Volt and 24 Volt power, including all step-down transformers, to all control devices. 21. Testing of existing systems including air systems readings. 22. Caulking around sleeves and fire-stopping at all floor and wall penetration of piping and ductwork.

Award

Educational

$599,668.00

Public - State/Provincial

Renovation

24

19

4

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
6
Bidding Soon
3,807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2022

May 16, 2022

Project location map

2900 Bedford Ave, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.