Published December 14, 2021 at 7:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Annapolis, Maryland. Completed plans call for site work for a water / sewer project.

As of 12/14/2021 This project has not been awarded. The Work includes the following major items: excavation and replacement of approximately 480 sewer manhole frames and covers throughout Anne Arundel County and replacement of an additional 900 sewer manhole covers only. Replace & Adjust Standard Manhole Frame, Cover & Adjustment Rings Replace & Adjust Watertight MH Frame, Cover & Adjustment Rings Furnish and Install Top Slabs Furnish Adjustment Grade Rings Replace manhole lids only Manhole Painting Traffic Control on SHA Roadways Stone #2 for Sediment Control on Filter Cloth, Including Removal After Completion of Construction Class 3 Excavation w/ Stone Refill/ Offsite Disposal of Unsuitable Material This Contract will be constructed under the provisions of the Anne Arundel County Government January, 2001 "Standard Details and Specifications for Construction" and any subsequent revisions thereto. The cost range for the Project is: $1,000,000 to $1,500,000. +1 669 900 6833 US 888 475 4499 US Toll-free 877 853 5257 US Toll-free All potential bidders are requested to attend this conference. However, attendance is not a requirement of the Contract. For ADA Accessibility Assistance Only:. TTY users, please call via Maryland Relay 7-1-1. All materials are available in an alternative format upon request. Questions regarding this Project should be directed to the PROJECT MANAGER, Nancy Whitnall, at 410-224-1265. ANNE ARUNDEL COUNTY Andrew Hime Purchasing Agent Each bid must be accompanied by a certified check or bid bond acceptable to the County for five percent (5%) of the amount of the bid, payable to Anne Arundel County, Maryland; and unless so A2-3 Revised 8/4/21 accompanied, the bid will not be considered. The check or bid bond will be forfeited to the County as liquidated damages in case the contract, performance bond, and labor and materials bonds are not executed within ten (10) days after receiving the contract for execution. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Total time for completion is four hundred (400) Consecutive calendar days; Liquidated damages ($1,500.00) per calendar day shall apply.

Bid Results

Water / Sewer

$745,892.00

Public - County

Site Work

502

7

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
591
Active Projects
266
Bidding Soon
2,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2021

January 31, 2022

Project location map

Multiple Locations, Annapolis, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.