BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Naperville, Illinois. Completed plans call for the renovation of a playground / park / athletic field.

It is anticipated that the contract will be awarded in December 2021/January 2022 The work consists of improvements to the Naperville Park District - North Maintenance Facility to be bid and constructed in phases. Phase 1 includes a complete roof replacement, including new overflow roof drains, heat trace for gutters and downspouts, and removal and reinstallation of rooftop mechanical equipment. Phases 2 and 3 will be bid out separately at a later date. All questions concerning this project should be directed to Tom McGrath, Lamp Incorporated, in writing to tmcgrath@lampinc.net. Questions will be received in writing only until noon on Thursday, November 4, 2021. Requirements and Performance Bond 1. If a bid is accepted, a Labor & Material Payment Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. A Performance Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. Such bonds shall include the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. 2. If a bid is accepted, the Contractor will be required to file a written substance abuse prevention program with the Owner for the prevention of substance abuse among its employees prior to the commencement of the work. Said program shall be available to the general public. Award of Contract It is anticipated that the contract will be awarded in December 2021/January 2022. The Park District reserves the right to reject any non-responsive or non-responsible bids or to reject all bids and waive any informality or technicality in any bid in the interest of the Naperville Park District. Notice to Proceed: 3/15/2022 Substantial Completion: 5/1/2022 Final Completion: 5/15/2022

Award

Playgrounds / Parks / Athletic Fields

$173,550.00

Public - City

Renovation

47

25

9

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
89
Bidding Soon
1,731
All Active Projects
759
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2021

March 15, 2022

img_map_placeholder

219 S Mill St, Naperville, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.