BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Port Washington, Wisconsin. Completed plans call for site work for a water / sewer project.

Contract Award Date: Apr 26, 2022 Contract Award Number: W912P622C0002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Roen Salvage Co. Contractor Awarded Address: Sturgeon Bay, WI 54235 USA Base and All Options Value (Total Contract Value): $933900.00 PROJECT TITLE: PORT WASHINGTON HARBOR BREAKWATER REPAIRS, PORT WASHINGTON, OZAUKEE COUNTY, WISCONSIN (USACE-CHICAGO DISTRICT PROJECT) PROJECT DESCRIPTION: Port Washington Harbor Breakw ater Repairs w ill consist of repairing the existing south breakw ater in order to maintain safe passage for vessels entering and exiting the harbor. Repair w ork w ill consist of placement of new armor stone and resetting existing armor stone as needed. COMPETITION FOR THIS ACQUISITION IS RESTRICTED TO HUBZONE SMALL BUSINESSES. The North American Industry Classification Code (NAICS) is 237990, w ith a size standard of $39.5M. Construction Wage Rates: Davis Bacon General Decision Number: WI20220015 02/25/2022 are applicable to this project. The Estimated Magnitude of Construction cost is betw een $1M and $5M. CONTINGENCY STATEMENT: This solicitation is contingent upon the USACE's receipt of 401 permit for this project. In this respect, the USACE is under no obligation to aw ard w ithout the 401 permit for this project until such requirement has been provided. How ever, if not received or w hen obtained, bidders w ill be notified via an Amendment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. (a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,566.62 for each calendar day of delay until the work is completed or accepted. Contract No - W912P6-21-C-0000

Award

Water / Sewer

$933,900.00

Public - Federal

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
91
Bidding Soon
1,185
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

June 20, 2022

Project location map

To Be Determined, Port Washington, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.