BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Boise, Idaho. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Contract Award Date: Mar 02, 2022 Contract Award Number: 1240LT22C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 080319995 Contractor Awarded Unique Entity ID (SAM): D4WKJD1YS1H3 Contractor Awarded Name: North Fork Enterprises, LLC Contractor Awarded Address: Pinehurst, ID 83850-8719 USA Base and All Options Value (Total Contract Value): $347022.00 Willow Creek Bridge Replacement Sawtooth National Forest Elmore County, Idaho.This project consists of removing an existing nail laminated timber bridge and abutments, furnishing and installing a new steel superstructure, concrete grade beams, a gravel wear surface on bridge and approaches, installing rip-rap, and installing 4 Type 3 object markers on glued-laminated guard posts. No stream crossings will be allowed and as such, contractor should be prepared to have equipment on both sides of the stream Contractor shall furnish all labor, materials, tools, equipment and supervision to replace the Willow Creek Bridge located in Elmore County, Idaho. This project consists of removing an existing nail laminated timber bridge and abutements, furnishing and installing a new steel superstructure in accordance with specifications and drawings. This project is located on FS Road 70227; Elmore County; Township 7 North, Range 14 East, Section 25; approximately 7 miles east of Featherville Idaho. The project may be reached by following State Highway 20 from Fairfield headed west approximately 20 miles then turn north toward Pine. Follow the Pine-Featherville Road for 32.5 miles until you reach the town of Featherville. Driving though Featherville stay on the asphalt road and follow it as it turns and heads east. Continue for 7 miles on the road, along the South Fork of the Boise River until you reach Willow Creek. Magnitude of Construction: Between $250,000 and $500,000 ANTICIPATED START DATE Planning and Bridge Fabrication - Winter of 2022 Construction - Spring of 2022. 100% Set Aside - Women-Owned Small Business (WOSB) . NAICS: 237310 Small Business Size: $39.5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE: 4.4% WBE: 6.9%

Award

Bridges / Tunnels

$347,022.00

Public - Federal

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
27
Bidding Soon
327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

March 4, 2022

Project location map

FS Road 70227, Boise, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.