Site work and new construction of an educational facility in San Lorenzo, California. Completed plans call for the construction of a 12,275-square-foot, one-story above grade educational facility; and for site work for a educational facility.

Project no: 2106, 20-053, 6960, 6961 Project No. 20-1810 CGS Application No. 04-CGS4625 For Arroyo High School New Building Part 2 Site Preparation Project BUILDING AREA BLDG 2&3: 6,700 SF (INCLUDES AREA COVERED BY NEW CANOPY) BUILDING AREA BLDG 1: 5,575 SF (INCLUDES AREA COVERED BY NEW CANOPY) The Project consists of, but is not limited to: 1. Preparation of the Site for the Installation of (3) new modular classroom buildings (to be fabricated and installed by American Modular Systems (AMS)). This includes but is not limited to: a. The excavation for rat slab installation necessary for modular classroom installation (Modular building foundation and Rat Slab to be installed by AMS) b. Installation of equipment inside modular buildings, including television monitors, ceiling hoist systems and building signage c. Electrical and Low Voltage work inside the building as noted in the drawings. This includes: i. Security, Fire Alarm System, Public Address System, Data and Internet ii. All underground conduits per project plans. iii. Conduits inside the buildings are to be provided by AMS (without pull strings). General Contractor required to complete wiring, and all necessary programming for low voltage work. iv. Electronic Door locks to be installed by American Modular Systems including its programming. 2. Provide all Utility Connections to new modular buildings 3. Fabrication and installation of (2) new metal canopies and their foundations a. Installation will need to occur after the placement of the new modular buildings 4. Install all new landscaping, irrigation, paving, and Outdoor Gathering Area hardscapes. Additional Site work includes but is not limited to: a. New Paving and Striping at multiple locations on Campus b. Demolition of existing site wall for additional access to new buildings c. Relocation of Existing Storage Containers d. Demolition of existing portable classrooms and fencing. Portable demolition to take place after project completion and occupancy. e. Installation of new fencing and gates A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the San Lorenzo Unified School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful bidder will be required to either meet the DVBE goal of three percent (3%) participation or demonstrate its good faith effort to solicit DVBE participation in this Contract if it is awarded the contract for the Work. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

Award

Educational

$2,779,700.00

Public - City

New Construction, Site Work

126

24

24

4

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
47
Bidding Soon
1,872
All Active Projects
789
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

January 26, 2022

img_map_placeholder

15701 Lorenzo Ave, San Lorenzo, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.