BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Seadrift, Texas. Completed plans call for site work for a road / highway; water / sewer project; and bridge / tunnel.

Bids shall be for the furnishing of all labor, materials, equipment, plant and superintendence, for performing the Work for the installation of approximately 24,953 LF of drainage channel ditches, 1782, LF of storm sewer pipe, 350 CY of rock rip-rap, and reconstruction of gravel roads all in accordance with the Plans and Specifications. Specified Work is set out in Document No. 00300 of these Contract Documents. OWNER and CONTRACTOR recognize that time is of the essence in this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in paragraph .03.a above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that, as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER THREE HUNDRED DOLLARS ($300.00) for each day that expires after the time specified in paragraph .03.a. CONTRACTOR hereby agrees that said sum per day is a fair estimate of the pecuniary damages which will be sustained by OWNER in the event that the Work is not complete within the agreed time, or within extensions of time properly granted in accordance with the Contract Documents. Said sum shall be considered as liquidated damages only and not a penalty, said damage being caused by loss oftimely use ofthe Work other injury difficult to quantify. For purposes of applying this liquidated damages clause, the CONTRACTOR agrees to waive as against the OWNER any defense to enforcement ofsaid clause based on any ofthe following claims: (1) that the clause is a penalty; (2) that the daily amount stated in the clause is not a reasonable estimate and approximation as of the time of contracting of OWNER'S actual damages; (3) that the damages caused to OWNER by reason of delay were not difficult to estimate at the time of contracting.

Award

Roads / Highways

$678,772.00

Public - County

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
9
Bidding Soon
261
All Active Projects
115
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

May 2, 2022

img_map_placeholder

Lane Rd, Seadrift, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.