BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2025 at 8:00 PM

Updated March 11, 2025

Demolition, site work and new construction of an educational facility in Coles Corner, Washington. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

As of March 10, 2025, construction is complete. The Almira School District requests qualifications from Design-Builders for the complete rebuild of the K8 School using the procedure permitted under Chapter 39.10 of the RCW, as amended, for selected projects for public works contracting in lieu of sealed bids. The project consists of multiple facets. First, the team will be tasked with assisting the school and its consultants in determining and defending the costs to replace the existing facility which was built in 1954, in today's figures with all required code upgrades. Secondly, the team will be working with the district and its consultants to design and build an education facility which has all of the needs of a typical school district to last for the next 50 to 75 years or longer. Design is anticipated to begin in November/December 2021 and be complete May/June 2022 with construction beginning immediately and completing early 2023. The Design-Builder shall provide high-quality services including scheduling, phasing logistics, collaboration with the design consultants, manage and estimate design budgets and design contingency solutions, direct construction best-practices, organize design investigative work and provide assistance in the selection of materials and building systems, solicit and manage subcontractor bid packages and supplier bidding. The Design-Builder shall provide high-quality construction services to safely deliver a superior project that comprises the full scope of program needs set by the district that is on time and on budget. Interested firms may obtain a copy of this Request for Qualifications from Jeff Jurgensen, Project Manager, OAC Services, Inc. at jjurgensen@oacsvcs.com. The Request for Qualifications outlines the information necessary to understand this selection process and the documentation required for submitting proposals. Qualifications must be received by Jeff Jurgensen, Project Manager, at the above email address no later than 3:00:00 p.m., Tuesday, November 09, 2021. Qualifications must be received by Jeff Jurgensen, Project Manager. The Project name and submittal date must appear as the subject of the email. Any firm failing to submit its qualifications in accordance with the procedures set forth in the Request for Qualifications may be considered non-responsive. Total Estimated Project Budget $20,000,000 The method of Contractor Selection has not been Determined at this time

Occupancy

Educational

$20,000,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
69
Bidding Soon
571
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2022

Project location map

To Be Determined, Coles Corner, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.