BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Pleasanton, California. Working plans call for the renovation of a educational facility.

The owner has determined a prequalified list of general contractors. Pleasanton Unified School District is seeking proposals from qualified persons, firms, partnerships, corporations, associations, or professional organizations to provide design, constructability review, value engineering, master scheduling, cost estimating, budgeting, pre-construction and construction services for the development and construction for the: FOOTHILL HIGH SCHOOL CTE WORKSHOP BUILDING, INCREMENT 2 MODULAR BUILDING Project, in accordance with the lease-leaseback structure set forth in Education Code section 17406 et seq. The responsibilities of the respondent will include but not limited to the following scopes and services at the various stage of the project: Design & Pre-construction: Respondent with the input of the District and design team will create drawings and specifications for a modular classroom building based on the criteria documents enclosed in the RFQ/P packet. These documents will be submitted to the Division of State Architect (DSA) for review by the respondent after approval by the design team. Construction: After stamped and approval by DSA, the Respondent will be responsible for the complete construction of the modular building. The construction will match and/or exceed the expectations and specifications as detailed per the project plans. The Request for Qualifications and Proposals which includes instructions for its completion, is enclosed for your consideration. Each respondent is solely responsible for timely submission of its RFQ/P Packet; the District is not responsible for any technological issues in a respondent's ability to timely submit its RFQ/P Packet or portion thereof. Questions regarding this RFQ/P may be directed to the construction manager Michael Rice mrice@pleasantonusd.net and must be submitted in writing on or by 2:00 P.M. on Wednesday, November 24, 2021. All Respondents must have already been prequalified by the District in accordance with Public Contract Code, 20111.6. First tier electrical, mechanical and plumbing subcontractors are required by Public Contract Code, 20111.6 and must be prequalified prior to subcontractor bids are submitted. Contractors of all tiers must be currently registered and qualified to perform public work pursuant to Labor Code, 1725.5. The District reserves the right to change the dates on the schedule without prior notice.

Final Planning

Educational

$12,000.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
93
Bidding Soon
1,939
All Active Projects
801
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

January 31, 2022

img_map_placeholder

4375 Foothill Rd, Pleasanton, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.