Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 17, 2021 at 7:00 PM

Updated November 14, 2023

Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.

COA Permit No.: SP-2021-0093D TC Permit No: 21-36264 For North Fork Wastewater Interceptor, Segment 4 For furnishing all labor, supplies, and supervision necessary for construction of North Fork Wastewater Interceptor, Segment 4 (the Project). No bids received by fax, email, or other digital means will be accepted. Any proposal received after the closing time will be filed unopened. The Project comprises the installation of approximately 1,045 linear feet of 18-inch gravity sewer pipeline at an average depth of 15 feet. The Award will be made on the basis of the lowest responsible bidder that is considered the most advantageous to the District and result in the best and most economical completion of the Project in accordance with Texas Water Code Section 49.273(c). The right is reserved to waive any informality in the bidding and to reject any or all bids. Located at: the connection at existing North Fork 2 Gravity Sewer 1,575 feet northwest of the intersection of Finial Dr. and FM 1625, traveling 1,045 feet northeast along future collector and terminating after crossing William Cannon Dr. The deadline to ask questions is 12/06/2021 5:00 PM CST a two year maintenance bond in the amount of 10% of the contract price

Bid Results

Water / Sewer

$570,843.00

Public - City

Site Work

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
126
Bidding Soon
2,900
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed