Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Sheridan, Wyoming. Completed plans call for site work for a water / sewer project.
Site Directions: Sheridan College campus 1 Whitney Way Sheridan, WY 82801 Project Category Code: Fittings and Valves, Electrical and Controls, Water and Wastewater Facilities Description: The Base Bid includes removal and replacement of existing irrigation pump station piping and equipment. This includes the pump, controller, filter, pipe stands, 8" and 12" piping, pipe fittings, sensors, all necessary electrical work, and all other work to verify the new equipment is in working order. Bid Alternate [1] includes installation of a new fertigation system tied directly into the new irrigation system. Bid Alternate [2] includes removal and replacement of new filter gravel and perforated piping at the intake structure. Est. Completion Date: May 10, 2022 Contractor shall understand that time is of the essence for this project. In consideration of this, an initial Notice to Proceed will be issued to the Contractor within ten (10) days of the Contract Award. This initial Notice to Proceed will not start the Contract Time, but is intended to direct the Contractor to begin the process for the ordering, shop drawing preparation, and submittal review and approval process for any equipment and materials that may require greater delivery time. The second Notice to Proceed to begin construction is expected to be issued no later than April 19, 2022 for a substantial completion date no later than May 10, 2022, but may be issued any time prior once the materials and equipment are available. Substantial Completion of the Work is to be completed within 21 calendar days from the issuance of the Notice to Proceed. Final completion is to be reached within 7 days of Substantial Completion. Final Payment will not be made until Final Completion is reached and all closeout documents acceptably submitted.
Bid Results
Water / Sewer
$255,980.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2021
April 19, 2022
1 Whitney Way, Sheridan, WY
Related To This Project
Sheridan, WY
Bid Date: Jun 02 2022
Sheridan, WY
Bid Date: Jun 07 2022
Sheridan, WY
--
Sheridan, WY
Bid Date: Jun 09 2022
Sheridan, WY
Bid Date: May 14 2019
Sheridan, WY
Bid Date: Mar 28 2019
Sheridan, WY
Bid Date: Apr 03 2019
Sheridan, WY
Bid Date: Jun 02 2022
Sheridan, WY
Bid Date: Jun 01 2022
Sheridan, WY
Bid Date: Jun 01 2022
Sheridan, WY
Bid Date: Dec 10 2021
Sheridan, WY
Bid Date: Apr 12 2022
Sheridan, WY
Bid Date: Apr 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.