BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Immokalee, Florida. Completed plans call for site work for a road / highway; bridge / tunnel; for outdoor lighting for a road / highway; and for paving for a road / highway.

Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 17 -- Intermediate I-75 (SR 93) at SR 951 TRC Members (Subject to Change) : Marlena Gore Sergio Figueroa Steve Davis The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the reconstruction of the I-75 at State Road 951 Interchange in Collier County from the existing Diamond Interchange to a Partial Cloverleaf Interchange with two connection ramps over State Road 84/David Blvd., from and to CR 951 (Collier Blvd.), to provide for the "Ultimate Configuration". The existing I-75 bridges over SR 951 will remain. New bridges to accommodate ramp traffic will be constructed adjacent to the existing mainline bridges as well as new bridges on State Road 951 over Davis Blvd will be constructed for direct interstate access. Buffered bike lanes will be provided along SR/CR 951. Project also includes Signing and Pavement Markings, Signalization, Lighting, and ITS. Work Mix: 17 - Intermediate Bridges that contain none of the types of construction listed under Major Bridges and span lengths exceeding 50 feet (center to center of cap) Estimated Contract Time: 1200 Days Stipend Amount: $206,648 Financial Management Number: 425843-2-52-01 The qualifications of the D-B Firm must be consistent with the structure type which will be proposed in the D-B Firm's LOI and technical proposal. Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit a completed and signed Bridge Design Qualification Form along with the LOI by the date/time deadline established for the LOI. Please refer to the preamble and advertisement for other submittal directions. All questions for this project must be submitted through the Department's Bid Question and Answer website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Reference appropriate Contract Number. You are responsible for monitoring this site for questions and answers throughout the procurement process. Phase I Selection Date/Time 12/14/2021 Pre-Proposal Meeting Date/Time 12/22/2021 Tech Proposal Due Date/Time 4/22/2022 Bid Price Due Date/Time 6/15/2022 Bid Opening Date/Time 6/15/2022 Final Selection Date/Time 6/21/2022 FDOT - RFP D/B - I-75 (SR 93) at SR 951 This project consists of the reconstruction of the I-75 at SR 951 Interchange from the existing Diamond Interchange to a Partial Cloverleaf Interchange with two connection ramps over SR 84/Davis Boulevard, from and to CR 951 (Collier Boulevard), to provide for the "Ultimate Configuration". The existing I-75 bridges over SR 951 shall remain. New bridges to accommodate ramp traffic shall be constructed adjacent to the existing mainline bridges as well as new bridges on SR 951 over Davis Boulevard shall be constructed for direct interstate access. The Department has established a Contract Duration of 1,175 calendar days for the subject Project.

Bid Results

Bridges / Tunnels

$97,900,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
165
Bidding Soon
2,500
All Active Projects
1,067
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 15, 2022

August 15, 2022

November 26, 2025

img_map_placeholder

I-75, Immokalee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.