BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 28, 2021 at 7:00 PM

Updated January 27, 2024

Renovation of an educational facility in Salem, Massachusetts. Completed plans call for the renovation of a educational facility.

The project includes the waterproofing and installation of metal panel system at the penthouse of Meier Hall, replacing existing storefront windows and doors, removal and relocation of antennas above the penthouse, and interior renovations required to bring affected spaces up to ADA code. All questions (RFIs) concerning the Drawings and Project Manual will be received via email up until 5:00pm, Friday, November 12, 2021 to Greg Burchard of Jones Architecture The work is estimated to cost $810,500. The applicable minority workforce utilization percentage is 5.0%. The applicable women workforce utilization percentage is 5.0%.

Bid Results

Educational

$905,000.00

Public - State/Provincial

Renovation

34

34

84

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
501
Active Projects
226
Bidding Soon
3,470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

January 17, 2022

Project location map

358 Lafayette St, Salem, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.