Published August 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and outdoor lighting for a road / highway in Bullhead City, Arizona. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

This project will utilize Highway Safety Improvement Program (HSIP) funds to install safety improvements on Silver Creek Road from Highway 95 to Bullhead Parkway; and on the Parkway from Canyon Rd to Hillview Dr. During a 5-year period ending December 31, 2016, 2 fatal and 2 suspected incapacitating crashes occurred within these road segments. The City requested the Arizona Department of Transportation (ADOT) to conduct a safety study on the Parkway. A safety audit was performed in April 2018 and identified Bullhead Parkway and Silver Creek Road in need of safety improvements. Safety improvements to Silver Creek will include street lighting, chevrons and curve warning signs, and speed feed signs. For the Parkway, street lighting will be installed from Canyon Rd to Hillview Drive (marker 1 on map below). Chevrons and curve warning signs will be installed on the Parkway at the curve at Laredo Drive (marker 2). Speed feed signs and reflective traffic signal backplates will be installed at North Oatman Road (marker 3) "Stop Ahead" and larger stop signs will be placed on Canyon Road (marker 4). Signal Ahead signage will be placed along the Parkway at signaled intersections (markers 5, 6, 7, 8, 9, 10) WACOG obtained funding on behalf of the City for this project. Federal grants for design of $360,600 and construction of $607,500 equal $968,100. Though no local match is required, staff is requesting $200,000 in FY 2022-23 for any additional improvements that may arise when the contractor is on site for this project. As of August 15, 2022, this project is currently in the FY 2022-2027 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$946,772.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
23
Bidding Soon
293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

Project location map

Silver Creek Rd & Bullhead Pkwy, Bullhead City, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.