Site work and new construction of a water / sewer project in Okeechobee, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of January 07, 2022, the Notice of Award is scheduled for the upcoming OUA Board meeting on January 10. A notice to proceed date is anticipated in February, with an estimated construction duration of 13 months. The project consists of furnishing labor, equipment, and materialsfor the construction of a duplex Master Pump Station (MPS), as described in the Drawings and Specifications. The work generally includes, but is not limited to, constructing a new wet well; connecting new gravity piping for future connection; and equipping the MPS with two submersible pumps, pump bases, guide rails, float switches, riser pipes, and access hatches. Also, constructing above-grade piping with check valves, isolation valves, a bypass connection, a flow meter, and an air release valve. Furnishing and installing a new control panel with pump controls, including electrical, instrumentation, and communication with supervisory control and data acquisition (SCADA). Furnishing and installing a new generator, fuel tank, and automatic transfer switch. The Work shall also include, but not be limited to, installing biofilter odor control units, providing site/civil improvements to a forested area, incorporating a new water service and electrical service, incorporating a travelling gate, and other civil, mechanical, structural, and electrical improvements as indicated by the Drawings and Specifications or as required to properly complete the project as planned. Any questions pertaining to the project specifications or scope of work will be addressed to ENGINEER, in writing to the physical or email address noted below, no later than December 15, 2021: Sumner Engineering & Consulting, Inc. Attn: Jeffrey M. Sumner, PE 410 NW 2 nd Street Okeechobee, FL 34972 jeff@sumnerengineering.com Each Proposal must be submitted on the prescribed form and accompanied by a certified check or bid bond executed on the prescribed form, payable to Okeechobee Utility Authority, in an amount not less than 5 percent of the amount bid. The bid form must be filled in completely and accurately, particularly as it pertains to alternate bid items. The successful Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract, as prescribed in the Contract Documents. The Okeechobee Utility Authority reserves the right to waive informalities in the bid, reject all Proposals or any Proposal not conforming to the intent and purpose of the Contract Documents, and to postpone the award of the Contract for a period of time which, however, shall not extend beyond forty-five (45) calendar days from the bid opening date. The estimated construction cost for the project is $1.5M - $2M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$1,894,600.00

Public - City

New Construction, Site Work

31

17

22

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
69
Bidding Soon
1,004
All Active Projects
481
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2021

February 21, 2022

img_map_placeholder

To Be Determined, Okeechobee, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.