BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 31, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a civil project in Marshall, Illinois. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

Job No. P-97-078-20/D-97-076-20, Reconstruction of structures carrying I-70 over East Little Creek, Phase I/II Engineering Services, Clark County, Region Four/District Seven This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 1, 2022 at 1:00 PM at the Region Four/District Seven Office in Effingham. The following structures are included in this project: o S.N. 012-0006: carrying I-70 over East Little Creek o S.N. 012-0007: carrying I-70 over East Little Creek The estimated construction cost for this project is $7,640,000. This contract must be completed by March 1, 2024. The Prime firm must be prequalified in the Structures (Highway: Typical) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Prequalified firms may indicate their desire to be considered for selection on any of the projects listed herein by submitting a separate Statement of Interest (SOI) for each project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764. The method of contractor selection has not been determined at this time. IDOT - 35 - RFQ Engineering - Reconstruction of Structures Carrying I-70 Over East Little Creek, Phase I/II Engineering Services

Design

Bridges / Tunnels

$7,640,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
71
Bidding Soon
888
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2022

Project location map

I-70, Marshall, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.