BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Grover Beach, California. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of February 26, 2025, this project has not ye been awarded. A timeline for the award has not yet been established.** General Work Description: In general, the Base Bid Work shall include removal of existing turf, site grading, proposed playground area with rubber surfacing, concrete pedestrian paths, picnic tables, benches, premanufactured restroom building, utility services to restroom, bandshell and concrete stage, concrete seat wall amphitheater, stormwater infrastructure, proposed landscaping and irrigation, site lighting. The estimated opinion of probable construction cost for this Base Bid Work is approximately $2,000,000.00. The Contractor shall possess a Class A license at the time this Contract is awarded through Contract acceptance and all applicable warranty periods. Each bid shall be accompanied by cash, certified or cashier’s check, or bidder’s bond for not less than ten percent (10%) of the amount of the base bid, made payable to the City. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project available from the California Department of Industrial Relations’ Internet web site at http://www.dir.ca.gov/OPRL/PWD/. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. The project is federally funded thus Davis Bacon requirements will be enforced. Federal minimum prevailing wage rates, as predetermined by the U.S. Department of Labor have been attached to this bid documents. If there is a difference between the federal minimum wage rates predetermined by the U.S. Department of Labor and the Prevailing Wage Rates determined by the Director of the Department of Industrial Relations of the State of California for similar classifications of labor, the Contractor and his subcontractor shall pay no less than the higher wage rate. Additionally, the prime contractor (and their subcontractors) will be required to be registered with the System of Award Management (SAM.gov) prior to work commencing. The Contract Time shall be two hundred (200) working days, and liquidated damages for delay shall accrue. Bidder’s inquiries shall be submitted in writing via e-mail to the City of Grover Beach, Public Works Department, at publicworks@groverbeach.org. The cutoff time that the City will accept bidder’s inquiries is 5:00 p.m. on the fifth City business day prior to the bid opening date. The City will respond to bidder’s inquires via bidding addenda. Any such inquiries, submitted after the cutoff time of receiving bidder’s inquiries, will not be treated as a bid protest. Liquidated delay damages for the City based on Contractor’s failure to achieve Completion within the above number of working days shall be $3,000 per calendar day, and they shall accrue automatically. as provided in the Special Provisions. The right is reserved by the City to reject any or all bids and to evaluate the bids submitted. The City further reserves the right to waive any informalities or minor irregularities in the bid.

Bid Results

Playgrounds / Parks / Athletic Fields

$2,564,133.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
1
Bidding Soon
210
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2025

March 24, 2025

Project location map

993 Ramona Ave, Grover Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.