Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 22, 2021 at 7:00 PM

Updated November 15, 2023

Site work for a mixed-use development in Fullerton, California. Completed plans call for site work for a water / sewer project.

The Work shall consist of, but not limited to, installing 8" PVC, large meter assembly, and appurtenances and abandoning existing water pipe and related appurtenances, installing 2" service and appurtenances, modifying irrigation, replacing existing 6" VCP sewer service with 6" HDPE, installing sewer cleanouts, and all related work. Any questions regarding this bid package may be referred to Nick Esposito, Public Works Department Engineering Division at 714.738.6851.

Award

Water / Sewer

$197,805.00

Public - State/Provincial

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
249
Bidding Soon
4,503
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2021

January 31, 2022

Project location map

201 S Basque Ave, Fullerton, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed