BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Hudson, New Hampshire. Completed plans call for site work for a water / sewer project.

**As of December 08, 2021, the project has not been awarded yet. It is anticipated to be awarded on 14th of December. All questions with regard to the Invitation to Bid should be addressed (in writing only) to the attention of: Elvis Dhima, P.E. Town of Hudson Engineering Department 12 School Street Hudson, NH 03051 edhima@hudsonnh.gov The deadline for all questions shall be at 10:00 a.m. on November 26, 2021 The successful bidder shall comply with all applicable Federal, State, and local laws, ordinances, rules, regulations, and codes in the performance of this contract. The bids will be evaluated based on cost and experience of the firm. All qualified bidders will receive consideration without regard to race, color, religion, creed, age, sex, or national origin. The Town of Hudson is an equal opportunity employer. The OWNER reserves the right to waive any informalities, to negotiate with any bidder and to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. All the bid package information will be available on the Town website. PROJECT BACKGROUND The Town is in need of lining 1,600 linear feet of thirty (30) inch pipe under Flagstone Drive , which is approximately eight to ten feet deep This project will be 100% funded by the Town of Hudson. SCOPE OF SERVICES The Town of Hudson Engineering and Public Works Department is soliciting Contractor services for LINING OF FLAGSTONE DRAINAGE MAIN The work will include the following: Cleaning of main Installing UV lining Providing the bypass Provide specifications about the UV liner All prices include mobilization, cleaning of existing main, liner, bypass, labor, etc. to provide a fully functioning main, once completed. The existing drain must remain operational at all times during the construction unless directed by the Town Engineer in writing. Proposers shall demonstrate experience in the design and installation of projects. 1. Description of Services Requested Contractor will need to provide the Town with a written description of the proposed work for review and approval. The Contractor shall rehabilitate the structurally and/or functionally deteriorated sanitary sewer and/or storm water pipelines using the trenchless method of cured-in-place pipe (CIPP) by ultraviolet light cure in accordance with these Specifications. The CIPP material shall consist of a resin-impregnated fiberglass material tube (''Liner'') which when cured shall extend the full length of the original pipe and provide a structurally sound, smooth, joint less and watertight pipe.

Award

Water / Sewer

$248,650.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
582
Active Projects
306
Bidding Soon
4,357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2021

January 10, 2022

Project location map

Flagstone Dr, Hudson, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.