Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 8, 2022 at 8:00 PM
Updated September 15, 2023
Renovation of an educational facility in Greeley, Colorado. Completed plans call for the renovation of a educational facility.
Reference Number 0000273281 Source ID PU.AG.USA.2360.C2703426 Job Location UNC Greeley Campus Piggyback Contract No Question Acceptance Deadline 12/07/2021 07:00 PM EST Questions are submitted online No The project is intended to replace the FACP, wiring and related detection devices in Gunter Hall on the UNC Greeley Campus. The current Fire Alarm Control Panel was installed in 1993 and outdated. We need to replace the Fire Alarm system with one that is addressable and up to current code utilizing our UNC design guidelines. For successful completion of project, the new fire alarm system will be installed while keeping the existing fire alarm active. Once the new fire alarm is tested and approved, the existing fire alarm and all components will be removed. It is anticipated that there will be some drywall and plaster patching and painting where existing devices have been removed. There is also trace levels of asbestos that will be encountered during the project, and a list of all tested items will be shared with the awarded contractor. The addressable system must network to either OnyxWorks Network (Notifier) or EBi Network (Honeywell) so both our Building Automation Department and Police Dispatch can view the systems Additional Bidding Instructions Construction schedule is heavily focused on the academic summer months of May-August. Since this is an academic building with classrooms and faculty offices, the awarded contractor will need to work closely with the UNC Project Manager for scheduling work in areas that are scheduled for summer courses. There is also an Audiology clinic in the lower level that operates year-round and work in their area will need to be coordinated with that department through the UNC PM. University of Northern Colorado intends to select a Design/Build Entity who will design, manage and construct the project Anticipated Construction Start/Finish 5/9/2022-8/12/2022
Award
Educational
$150,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2021
May 9, 2022
501 20th St, Greeley, CO
Related To This Project
Greeley, CO
Bid Date: Sep 08 2022
Greeley, CO
--
Greeley, CO
Bid Date: Sep 13 2022
Greeley, CO
Bid Date: Sep 15 2022
Greeley, CO
Bid Date: Feb 18 2025
Greeley, CO
Bid Date: Feb 18 2022
Greeley, CO
--
Greeley, CO
Bid Date: Apr 30 2019
Greeley, CO
Bid Date: Sep 08 2022
Greeley, CO
Bid Date: Aug 31 2022
Greeley, CO
Bid Date: Jul 21 2022
Greeley, CO
--
Greeley, CO
Bid Date: Aug 15 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
