EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Durham, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of June 9, 2022, the project has been awarded and the general contractor has been issued notice to proceed, however, a firm start date for construction has not been established as the general contractor is still finalizing plans and sourcing materials. The Project involves the furnishing of all materials, labor, equipment, tools, etc., unless otherwise specified, for a complete and operable installation of: BASE BID: Consists of the installation of approximately 4,600-feet of 36-inch DIP force main, plug valve assemblies, air/vacuum release valve assemblies, precast concrete manholes, bored and jacked or microtunneled steel casing pipe roadway/railroad crossing, miscellaneous valves, fittings, piping, and connections to existing piping. Services also shall include, but not limited to, clearing, and grubbing, earthwork, access roads, erosion and sedimentation control, surface restoration, and all associated appurtenances, as described in the Specifications and shown on the Drawings. ALTERNATE BID NO. 1: Consists of the installation of approximately 4,600-feet of 42-inch DIP force main, plug valve assemblies, air/vacuum release valve assemblies, precast concrete manholes, bored and jacked or microtunneled steel casing pipe roadway/railroad crossing, miscellaneous valves, fittings, piping, and connections to existing piping. Services also shall include, but not limited to, clearing, and grubbing, earthwork, access roads, erosion and sedimentation control, surface restoration, and all associated appurtenances, as described in the Specifications and shown on the Drawings. ALTERNATE BID NO. 2: Consists of the installation of approximately 4,600-feet of 48-inch DIP force main, plug valve assemblies, air/vacuum release valve assemblies, precast concrete manholes, bored and jacked or microtunneled steel casing pipe roadway/railroad crossing, miscellaneous valves, fittings, piping, and connections to existing piping. Services also shall include, but not limited to, clearing, and grubbing, earthwork, access roads, erosion and sedimentation control, surface restoration, and all associated appurtenances, as described in the Specifications and shown on the Drawings. Bidders must contact the City of Durham Equity & Inclusion Department at 919-560-4180 with any questions or concerns associated with the UBE requirements and forms. The Construction Project Manual Statement is found in Appendix A, and the UBE Construction Forms are found in Appendix B of the Contract Documents. The established UBE goals for this project are 11% for minority and 7% for women participation. To ensure that all Bidders are kept up-to-date on any Addenda, changes, or informational notices, please send an e-mail to: kevin.carter@carterengineeringcompany.com indicating your intention to prepare a Bid for the Project. Failure to complete this step may render your Bid as non-responsive. Questions concerning this project shall be submitted in writing to Kevin F. Carter, P.E. via email no later than 4:00 p.m., local time, on Thursday, December 9, 2021. Indicate Project name in the subject heading of the email. The City of Durham requires the Project to be Substantially Complete within 330 Consecutive Calendar Days from date of Notice to Proceed, and Final Completion within 360 Consecutive Calendar Days from the date of Notice to Proceed. No Bid shall be considered or accepted unless at the time of its filing the same shall be accompanied by a deposit of cash or a certified or cashier's check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation (FDIC), in an amount equal to five percent (5%) of the amount of the Bid for the "highest Bid amount". The check shall be made payable to the City of Durham, North Carolina. Said deposit shall guarantee that the Contract will be entered into by the successful Bidder if the award is made. Such deposit of cash or certified or cashier's check may be held by the City until the successful Bidder has executed and delivered the Contract Documents, including performance and payment bond, to the City of Durham and returned or kept in accordance with North Carolina General Statute 143-129. In lieu of the cash deposit, certified check, or cashier's check mentioned above, the Bidder may file a Bid Bond in the same amount executed by a corporate surety authorized to execute such bonds in North Carolina and conditioned as provided by North Carolina General Statute 143-129 and in the form attached to the Bidding Documents (see Appendix F). Bid bond forms enclosed as part of the Bidding Documents must be properly executed at the time Bids are submitted before the Bid will be considered. Properly executed Power of Attorney of the corporate surety's agent shall accompany such bond and be attached to the page provided therefore in the Bidding Documents. Bids shall be submitted under a condition of irrevocability, except as required by law, for a period of ninety (90) days after Bid opening. The City of Durham reserves the right to accept or reject any or all Bids, to waive any and all informalities, and to disregard all nonconforming or conditional Bids or counter Bids, and to accept the Bid that will be in the best interest of the City of Durham.

Award

Water / Sewer

$6,719,111.00

Public - City

Paving, Site Work

34

17

17

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Structural Aluminum Framing, Metal Fabrications, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Wall Finishes, Stone Facing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
57
Bidding Soon
1,237
All Active Projects
487
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

July 11, 2022

img_map_placeholder

To Be Determined, Durham, NC

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Eno River Force Main Relocation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.