BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Taylorsville, Utah. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Taylorsville-Bennion Improvement District (Owner of the work) requests Contractor Pre-qualification Proposals for construction of the Jordan River Siphon and District Outfall Line Project. Bids will only be accepted from those Contractors that are pre-qualified by the Owner. No other Contractors will be eligible to bid on this Project. The tentative project schedule is as follows: Pre-qualification documents available November 5, 2021 Project Construction January 3, 2022 to June 30, 2022 The work comprises the construction of a three (3) barrel siphon (26-inch and 28-inch HDPE pipe approximately 154 feet long) crossing the Jordan River and constructing 1,725 linear feet of 42-inch gravity sewer in high ground water conditions from approximately 1100 West 3900 South to 900 West Carlisle Park Lane in Millcreek and South Salt Lake City, Utah. The project also includes constructing an air jumper for the siphon, siphon inlet and outlet structures, sewer manholes, Palmer-Bowlus flow meter, meter enclosure structure, field restoration, landscape restoration, and asphalt road restoration. All communications relative to this WORK shall be directed to the ENGINEER prior to submittal of the Prequalification Information: Bowen, Collins & Associates 154 East 14075 South Draper, UT 84020 (801) 495-2224 Attention: Brent Packer, P.E. (Project Manager) bpacker@bowencollins.com Note: Please direct all questions to Brent Packer The construction of drinking water pipeline improvements including 6,615 feet of 24-inch C900 PVC transmission pipeline. This includes 2,600 linear feet of trenching and asphalt restoration in UDOT right-of-way in 5400 South, about 6400 square yards of 1-inch mill and overlay with open graded surface course (OGSC), with 190 feet of trench under the I-215 overpass requiring internally braced shoring, and 295 feet of trench being backfilled with flowable fill. It also includes 4,015 feet of trenching and asphalt restoration in Taylorsville right-of-way in 2200 West. SITE OF WORK: 5400 South from 2200 West to 2700 West, 2200 West from Quailstone Drive to 5400 South, Taylorsville, UT.

Award

Roads / Highways

$4,058,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
71
Bidding Soon
965
All Active Projects
387
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 6, 2022

March 17, 2022

October 14, 2022

img_map_placeholder

Multiple Locations, Taylorsville, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.