Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Fairfax, Virginia. Completed plans call for the renovation of a educational facility.

Rooftop Unit Replacements - Daniels Run Elementary School It is the intent of this contract to remove four (4) rooftop units and replace them with four (4) new packaged rooftop units at the specified location. The work shall include all associated demolition rigging, piping, equipment, electrical equipment, controls, insulation, patching, painting and related work as shown on the project drawings and as detailed in these specifications to provide a complete and fully operational installation. Onsite work shall begin on June 27, 2022. Final Completion on or before July 15, 2022.

Award

Educational

$450,251.00

Public - County

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
549
Active Projects
225
Bidding Soon
3,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

June 27, 2022

Project location map

3705 Old Lee Hwy, Fairfax, VA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed