BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in San Jacinto, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Resurfacing of Parking Lot E including Round-About, Maintenance Yard and Misc. Bollards & Speed Bumps Slurry Seal, Crack Sealing & Striping at the San Jacinto Campus CONTRACT TIME: January 10, 2022 through April 10, 2022 REQUIRED LICENSE: C12 Earthwork and Paving Contractors or C32 Parking and Highway Bids will not be accepted if a Contractor has not been added to the Pre-Qualified Contractor List for the Calendar Year 2021. 1. Parking Lot D at San Jacinto College (see Exhibit A) o Approximately 111,000 S.F. o Remove and dispose existing 21 concrete planters o Pulverize approximately 111,000 S.F. up to 6" in depth of asphalt and subgrade blending to act as base material o Fine grade previously 111,000 S.F. pulverized asphalt. Roll and roll compact previously pulverized asphalt o Pave over 111,000 S.F. previously pulverized and compacted material with up to 3" of hot mix asphalt. Roll and compact o Install approximately 510 L.F. of redwood header against field to stop asphalt from rolling out. Striping o Qty. 230 Double White Lines New Layout o Qty. 6 Handicap, Crosshatch & 1' No Parking o Qty. 5 Handicap (Stall Only) o Qty. 2 8' Stop & Bar o Qty. 25 L.F. of Double Yellow Line o Qty. 876 S.F. APPROX. of Crosshatching o Qty. 1112 L.F. APPROX. of 4" White Line o Qty. 50 4' Wheel Stops o Qty 11 Wheel Stops Painted Blue 2. Parking Lot E at San Jacinto Campus (Exhibit A) o Approximately 109,000 S.F. o Remove and dispose existing 17 concrete planters o Pulverize approximately 109,000 S.F up to 6" of asphalt and subgrade blending to as act as base material o Fine grade approximately 109,000 S.F of previously pulverized asphalt. Roll and roll compact previously pulverized asphalt o Pave over approximately 109,000 S.F previously compacted pulverized material with up to 3" of hot mix asphalt. Roll and compact o Install approximately 750 L.F. of redwood header against field to stop asphalt from rolling out. Striping o Qty. 180 stalls Double White Lines New Layout o Qty. 8 Handicap, Crosshatch & 1' No Parking o Qty. 5 Handicap (Stall Only) o Qty. 5 8' Stop & Bar o Qty. 2 Arrows o Qty. 46 L.F. APPROX. of Double Yellow Line o Qty. 608 S.F. APPROX. of Crosshatching o Qty. 1112 L.F. APPROX. of 4" White Line o Qty. 46 of 4' Wheel Stops o Qty. 13 Wheel Stops Painted Blue 3. Campus Entrance Roundabout (Exhibit A) o Approximately 48,476 S.F. o Power clean and seal coat o (2) Coats of OverKote industrial pavement sealer or equivalent. Crack-Seal o Clean and seal approximately 5,000 L.F. worse case cracks with an industrial seal material Striping o Qty, 2430 L.F. of4" White Skip Line o Qty. 3 of 8" Stop & Bar o Qty. 3 arrows 4. Maintenance Yard (Exhibit B) o Approximately 92,300 S.F. o Pulverize approximately 92,300 S.F up to 6" of asphalt and subgrade blending to as act as base material o Fine grade approximately 92,300 S.F of previously pulverized asphalt. Roll and roll compact previously pulverized asphalt o Pave over approximately 92,300 S.F previously compacted pulverized material with up to 3" of hot mix asphalt. Roll and compact 5. Miscellaneous (Exhibit C) o Installation of 9 Bollards: o Qty. 3 in front of the 750 Building access ramp o Qty. 3 immediately past the campus access stop sign on Community College Dr./Eagle dr. (access road used to enter the athletics area) o Qty. 3 at the on campus access ramp between the tennis courts and football field in lot C o Installation of 4 Speed Bumps

Award

Sidewalks / Parking Lot

$212,000.00

Public - City

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
103
Bidding Soon
1,562
All Active Projects
734
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

February 14, 2022

img_map_placeholder

Multiple Locations, San Jacinto, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.